One critical unit is degrading faster than planned. A single crew is available. Linked assets limit how much load can be redistributed. The planning task is to compare waiting for a later window, stopping earlier for repair, or temporarily reducing load — and to show how a refined forecast can change the ranking before anyone approves a move.
Educational framing aligned with the research illustration — not a client case study and not proof of a finished product algorithm.